26620210_custom
26491850_custom
homepage3

Preparation of temporary safe work procedure:

When access to a building façade by means a suspended access platform is required to facilitate a maintenance activity, it is normally achieved by means of rigging a suspended work platform normally referred to as a swing stage form the building roof. Normally buildings are designed with dedicated permanent access systems to enable this activity, however, in some circumstances, permanent equipment either does not exist or adequate coverage for some parts of the building façade has not been provided. In these circumstances developing a concise temporary rigging and safe work procedures becomes an increasingly important element of a projects health and safety requirements.

Incorrect rigging and use of swing stages can introduce significant hazards to the safe work process that could expose workers unnecessary risk of fall from height and property damage.

Anchor Experts’ engineers will work with you to fully understand the functional requirements and limitations of the project as well as the equipment intended to be used for the purpose. We will develop engineered drawings and safe work procedures to would enable you to rig the access system in conformity with all applicable portions of regulations and CSA Z91.

TALK TO US > Our technical advisors stand ready to help you. Give us a call or drop us a line and one of our technical advisors will be happy to assist you.